We recently completed a Blow-down and Industrial Painting project at Fincantieri Bay Shipbuilding. They build commercial ships used in private industry on an international scale.
One of the challenges was staging. We had to get our lifts on top of a roller foundation (We worked in conjunction with Fincantieri Bay Shipbuilding to accomplish).
The time frame was very tight due to the new scheduled ship to be built. We ran double shifts to accommodate their schedule as every hour was critical to stay on their production schedule.

Ship building cleaning services

Project Scope:

Blow-down all walls, support columns, pipes, tops of overhead cranes and all horizontal surfaces from lower crane rails down to floor.
Spay paint lower 40′ perimeter.
Recoveron personal lift certified, lockout- tag certified, compliance with Bay safety.

Customer Quote

“Recoveron did a fantastic job working in and around our production schedule to complete a massive cleaning and painting project in our main fabrication shop. The team used 400 gallons of paint to brighten the walls of the 78,000 square foot space. Recoveron’s top-notch service, attention to detail as well as planning and coordination from start to finish was exceptional.”